With 20 years of experience, ETM Marine has participated in many projects around the world
Port of BORDEAUX PAUILLAC-TROMPELOUP
Docking system for the AIRBUS barge
LA ROCHELLE Oil tanker station
Mooring of ship on quick release hooks.
PORT OF BORDEAUX BERTHS 511 AND 512
Automated mooring management with interface to manage environmental parameters (wind and water level)
LA ROCHELLE ANSE SAINT MARC
Docking and mooring on Duc d’Albe at the end of the quay
DEGRAD DE CANNES GUYANA
Cylindrical docking system
PRESQUE-ILE CAP FERRET
Installation of 40 innovative moorings
Bora-Bora, French Polynesia
Installation of Béa buoys, the connected buoy, and low-impact moorings
Nonza, Corsica
Installation of innovative moorings with less environmental impact